Mbada Diamonds

This project involves construction of a 5ML reinforced concrete water reservoir and a 19km 350mm diameter GI rising main from Odzi River to Mbada Diamonds Mine in Chiadzwa. The project has been successfully completed at a total cost of USD 4.2m (four million two hundred thousand dollars only).The works included abstraction works at the river point and two (2) pump stations, and the distribution network to various processing points on the mine.